Field and Construction Experience
Water Quality
I am familiar with many field
and laboratory sampling and testing procedures for water quality and water
chemistry, particularly from Standard Methods for Water and Wastewater
Examination. Procedures I am fluent with include biochemical
oxygen demand (BOD), chemical oxygen demand (COD), total suspended solids
(TSS) and total solids (TS) with or without volatiles, nitrate, ammonia,
phosphate, alkalinity, hardness, chlorine demand, pH, electroconductivity,
dissolved oxygen, and many others.
-
Weekly sampling and testing of influent and
effluent from constructed wetlands cells for wastewater treatment (March
1998 through January 1999). Field and laboratory testing included
temperature, BOD, COD, TSS, pH, and electroconductivity.
-
Field sampling and analysis of macrophyte
productivity in constructed wetlands for wastewater treatment (1998).
-
Preparation and supervision of field water
quality experiments for a class on constructed wetlands for wastewater
treatment (1998).
-
Water quality analysis (1997-1999).
Preparation and supervision of laboratories for various water chemistry
tests for introductory and advanced classes in water chemistry.
-
Stream cross-sections and surveying (1997).
Participation in the field work for a baseline study on an impacted stream
before restoration activities were undertaken.
-
Groundwater sampling (1996). Field testing
of turbidity, pH, and electroconductivity. Sampling for laboratory
testing, including full quality assurance program, for groundwater monitoring
on and around landfills.
Soils and Geosynthetic Projects
I have been involved with all types of
geosynthetics, as well as concrete and earthwork, in containment applications.
I have worked as CQC or CQA inspector on the installation of over 6 million
square feet of geomembranes on over 30 projects.
I am familiar with all aspects of monitoring
and documentation for the installation of geosynthetic containment systems,
as well as related soil placement procedures. My experience includes conducting
and overseeing both nondestructive tests and destructive tests on geosynthetics
in the field, as well as in-place soils density and moisture tests. I have
also worked in laboratory testing of geosynthetics, both physical and chemical,
and of soils.
-
Double-Lined Leachate Pond (1997),
Olympic View Sanitary Landfill. Client: USA-Waste, Port Orchard, Washington.
On-site Quality Assurance Monitor for soils density testing, as well as
the installation and welding of 88,000 ft2 (8,200 m2)
of textured HDPE membrane, 60 mil (1.5 mm) thick, along with geotextiles,
GCL, and geonets.
-
Composite Landfill Liner, Primary and Secondary
(1997), Riverbend Landfill. Client: USA-Waste, McMinnville, Oregon. On-site
Quality Assurance Monitor for the installation and welding of 475,000 ft2
(44,000 m2) of textured HDPE membrane, 60 mil (1.5 mm) thick,
along with geotextiles, GCL, and geonets.
-
Composite Landfill Liner (1996), Sunshine
Canyon Landfill. Client: Brown-Ferris Industries, Sylmar, California. On-site
Quality Assurance Monitor for the installation and welding of 475,000 ft2
(44,000 m2) of textured HDPE membrane, 60 mil (1.5 mm) thick,
along with geotextiles, GCL, and geonets.
-
Double-Lined Leachate Pond (1995),
Sonoma Central Landfill. Client: County of Sonoma, Cotati, California.
On-site Quality Assurance Manager for the installation and welding of 220,000
ft2 (20,000 m2) of textured HDPE membrane, 60 mil
(1.5 mm) thick, along with geotextiles, GCL, and geonets.
-
Composite Landfill Liner (1995), 1994
NE Disposal Unit. Client: City Garbage Company of Eureka (Norcal Waste
Systems), Eureka, California. On-site Quality Assurance Manager for the
installation and welding of 110,000 ft2 (10,000 m2)
of textured HDPE membrane, 60 mil (1.5 mm) thick, along with clay liner,
geotextiles, GCL, and geonets.
-
Composite Landfill Liner (1995), Vasco
Road Landfill. Client: BFI Inc., Livermore, California. On-site
Quality Assurance Monitor for the installation and welding of 220,000 ft2
(20,000 m2) of textured HDPE membrane, 60 mil (1.5 mm) thick,
along with bentonite-soil liner, geotextiles, and geonets.
-
Soil Vapour Barrier and Foundation Waterproofing
(1993), Building 10. Client: Hewlett-Packard, Palo Alto, California. On-site
Quality Assurance Monitor for the installation of 50,000 ft2
(5,000 m2) of sprayed-on "Liquid Boot" chloroprene modified
asphaltic emulsion, 80 mil (2 mm) thick, along with geotextiles.
-
Aeration Ponds (1992), Town of Mattawa,
Ontario, Canada. On-site Quality Assurance Manager for the installation
and welding of 650,000 ft2 (60,000 m2) of HDPE membrane,
60 mil (1.5 mm) thick, along with geotextiles and geonets.
-
Maximum Security Landfill Cover (1992),
Cell No. 9. Client: PPG Canada inc., Beauharnois, Québec, Canada.
On-site Quality Assurance Manager for the installation and welding of 296,000
ft2 (27,500 m2) of HDPE membrane, 60 mil (1.5 mm)
thick, along with geotextiles and a clay liner.
-
Double-Lined Maximum Security Landfill
(1992),
Cell No. 10. Client: PPG Canada inc., Beauharnois, Québec. On-site
Quality Assurance Manager for the installation and welding of 565,000 ft2
(52,500 m2) of HDPE membrane, 80 mil (2 mm) thick, along with
geotextiles, geonet and a clay liner.
-
Double-Lined Leachate Storage Ponds
(1991), Faraday Landfill. Client: Township of Faraday, Bancroft, Ontario.
On-site Quality Assurance Manager for the installation and welding of 142,000
ft2 (13,000 m2) of HDPE membrane, 80 mil (2 mm) thick,
along with geotextiles and geonets.
-
Stock Pad Secondary Containment (1991).
Client: PPG Canada inc., Beauharnois, Québec. Quality Assurance
Manager for the shop fabrication and field installation of 10,000 ft2
(900 m2) of PVC membrane, 30 mil (0.75 mm) thick, along with
geotextiles.
-
Double-Lined Leachate Storage Pond
(1991), Colonie Sanitary Landfill. Client: Town of Colonie, New York. On-site
Quality Control Manager for the installation and welding of 77,500 ft2
(7,200 m2) of HDPE membrane, 60 mil (1.5 mm) thick, along with
geotextiles.
-
Aerated Lagoons (1991), Wastewater
Treatment Plant. Client: Municipality of Lacolle, Québec. Quality
Control Manager for the shop fabrication of 220,000 ft2 (20,000
m2) of PVC membrane, 40 mil (1 mm) thick, along with geotextiles.
-
Aerated Lagoons (1991), Wastewater
Treatment Plant. Client: Municipality of L'Annonciation, Québec.
Quality Control Manager for the shop fabrication of 330,000 ft2
(30,000 m2) of PVC membrane, 40 mil (1 mm) thick, along with
geotextiles.
-
Aerated Lagoons (1991), Wastewater
Treatment Plant. Client: Municipality of Lac Delage, Québec. Quality
Control Manager for the shop fabrication of 220,000 ft2 (20,000
m2) of PVC membrane, 40 mil (1 mm) thick, along with geotextiles.
-
Treatment Lagoon Liners and Floating Covers
(1990-1991), Anaerobic Digestion Lagoons. Client: McCin Foods inc., Carleton,
Prince Edward Island, Canada. Quality Control programme conception and
management for the field installation of 140,000 ft2 (13,000
m2) of HDPE membrane, 80 mil (2 mm) thick, along with geotextiles
for bottom liners; and for the shop fabrication and field installation
of 140,000 ft2 (13,000 m2) of "XR-5" reinforced ethylene
interpolymer alloy (EIA-R) membrane, 30 mil (0.75 mm) thick, for the floating
covers, along with a gas collection system, baffles, and a flotation system.
-
Double-Lined Secondary Containment for
Aromatic Hydrocarbons (1991), Sludge Box. Client: Petro-Canada inc.,
Montréal-Est, Québec. Quality Assurance Manager for the shop
fabrication and field installation of 2,000 ft2 (200 m2)
of XR-5" reinforced ethylene interpolymer alloy (EIA-R) membrane, 30 mil
(0.75 mm) thick, along with geotextiles.
-
Secondary Containment for Fuel Tanks
(1991). Client: Esso Petroleum, Saint-Jean-Port-Joli, Québec. Quality
Control Manager for the shop fabrication of 4,000 ft2 (375 m2)
of "Hytrel" reinforced polyester elastomer membrane.
-
Double-Lined Hazardous Waste Landfill
(1990). Client: Cintec Environnement inc., Ville Lasalle, Québec.
On-site Quality Control Manager for the installation and welding of 151,000
ft2 (14,000 m2) of HDPE membrane, 80 mil (2 mm) thick,
along with geotextiles, geogrids, and geonets.
-
Leachate Treatment Lagoons (1990).
Client: Les Entreprises Sanipan, Saint-Nicéphore, Québec.
Quality Control Manager for the shop fabrication and field installation
of 291,000 ft2 (27,000 m2) of PVC membrane, 40 mil
(2 mm) thick, along with geotextiles.
-
Aerated Lagoons (1990), Wastewater
Treatment Plant. Client: Municipality of Cap-aux-Meules, Québec.
Quality Control Manager for the shop fabrication of 220,000 ft2
(20,000 m2) of PVC membrane, 40 mil (1 mm) thick, along with
geotextiles.
-
Secondary Containment (1990), Acid
Tanks. Client: Stefil, Lachine, Québec. On-site Quality Control
Manager for the installation and welding of 2,000 ft2 (200 m2)
of HDPE membrane, 100 mil (2.5 mm) thick, along with geotextiles.
-
Concrete Slab Waterproofing (1990).
Client: Téléglobe Canada, Montréal, Québec.
Quality Control programme conception and management for the installation
of 22,000 ft2 (2,000 m2) of sprayed-on "Futura Geothane"
modified urethane membrane, 90 mil (2.25 mm) thick.
-
Secondary Containment (1990). Client:
Expro, Saint-Timothée, Québec. On-site Quality Control Manager
for the installation and welding of 5,000 ft2 (500 m2)
of HDPE membrane, 60 mil (1.5 mm) thick, along with geotextiles.
-
Landscaping Pond (1990), Chinese Garden.
Client: Montreal Botanical Garden, Montréal, Québec. On-site
Quality Control Manager for the installation and welding of 59,000 ft2
(5,500 m2) of HDPE membrane, 40 mil (1 mm) thick, along with
geotextiles.
-
Containment Dike (1990). Client: Cintec
Environnement inc., Ville Lasalle, Québec. On-site Quality Control
Manager for the installation and welding of 30,000 ft2 (2,800
m2) of HDPE membrane, 40 mil (1 mm) thick, along with geotextiles.
-
Hazardous Waste Landfill Cover (1990),
Cell I-4 (B). Client: Stablex Canada, Blainville, Québec. On-site
Quality Control Manager for the installation and welding of 151,000 ft2
(14,000 m2) of HDPE membrane, 100 mil (2.5 mm) thick, along
with geotextiles.
-
Stock Pond (1990). Client: ICI, McMasterville,
Québec. On-site Quality Control Manager for the installation and
welding of 14,000 ft2 (1,300 m2) of HDPE membrane,
60 mil (1.5 mm) thick, along with geotextiles.
-
Secondary Containment (1990), Transformers.
Client: NB Power, Grand Manan, New-Brunswick, Canada. On-site Quality Control
Manager for the installation and welding of 32,000 ft2 (3,000
m2) of HDPE membrane, 60 mil (1.5 mm) thick, along with geotextiles.
-
Stock Pile Cover (1989). Client: Métaux
Timminco, Beauharnois, Québec. On-site Quality Control Manager for
the installation and welding of 248,000 ft2 (23,000 m2)
of HDPE membrane, 40 mil (1 mm) thick.
-
Hazardous Waste Landfill Cover (1989),
Cell I-4 (A). Client: Stablex Canada, Blainville, Québec. On-site
Quality Control Manager for the installation and welding of 129,000 ft2
(12,000 m2) of HDPE membrane, 100 mil (2.5 mm) thick, along
with geotextiles.
-
Stock Pad (1989). Client: PPG Canada
inc., Beauharnois, Québe. On-site Quality Control Manager for the
installation and welding of 22,000 ft2 (2,000 m2)
of HDPE membrane, 60 mil (1.5 mm) thick, along with geotextiles.
-
Double-Lined Maximum Security Landfill
(1989), Cell No. 9. Client: PPG Canada inc., Beauharnois, Québec.
On-site Quality Assurance Monitor for the installation and welding of 345,000
ft2 (32,000 m2) of HDPE membrane, 60 mil (1.5 mm)
thick, and 345,000 ft2 (32,000 m2) of HDPE membrane,
100 mil (2.5 mm) thick, along with geotextiles, geogrids, geonets, and
a clay liner.
Return
to Résumé
Return to Sophie's
Homepage